Facility addition of some 72,000 square feet with multiple overhead material handling equipment throughout and conversion of an existing 40,000 square foot rack supported high density warehouse to a high bay overhead crane manufacturing unit. Work was performed as an integrated project team approach led by Berghammer Construction Corporation.